Remove 2001 Remove Document Remove Risk Remove Testing
article thumbnail

Data Science at The New York Times

Domino Data Lab

Because I’m an academic I like to look at the original founding documents. Here is an ancient document about data science, specifically a piece by Jeff Hammerbacher. The other ancient and canonical document for trying to explain to people above me what we do in the data science group is this one. Good, okay.

article thumbnail

Themes and Conferences per Pacoid, Episode 8

Domino Data Lab

Also, while surveying the literature two key drivers stood out: Risk management is the thin-edge-of-the-wedge ?for They sold off most of the company later, retaining some of its IP, and are known to have kept copies of internal documents. A very big mess since circa 2001, and now becoming quite a dangerous mess. It’s a mess.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

To Balance or Not to Balance?

The Unofficial Google Data Science Blog

A naïve way to solve this problem would be to compare the proportion of buyers between the exposed and unexposed groups, using a simple test for equality of means. Random forest with default R tuning parameters (Breiman, 2001). This fact is well documented by Kang & Schafer (2007). CBPS (exact and over-parameterized).

article thumbnail

Themes and Conferences per Pacoid, Episode 12

Domino Data Lab

The second rule of Foo Camp concerns a practice called “FrieNDA” where people speak candidly and others respect that without either (1) “Oh gosh I must live tweet stream this amazing insight” or (2) anybody having to sign legal documents. The probabilistic nature changes the risks and process required. Sci Foo 2019. No big deal.”.

article thumbnail

Top 15 project management certifications

CIO Business Intelligence

The exam covers topics including Scrum, Kanban, Lean, extreme programming (XP), and test-driven development (TDD). The certification focuses on managing, budgeting, and determining scope for multiple projects, multiple project teams, and assessing and mitigating interdependent risks to deliver projects successfully. Price: $280.